Projects

Assembling of Vessels for Oil and Gas Processing on Project: West Dikirnis Field–Egypt

Client: "Optimus engineering" Co.

Completed: 2007 September

Supply of steels, manufacturing, blasting and painting of steel module structures (84 tones), mounting of technological equipment for oil and gas processing (145 tones) and assembling-erection of steel pipelines, appliances, control valves for oil and gas (60 tones), nondestructive control of welded joints (VT, RT, MPI), anticorrosion protection and tests for strength and solidity.