Projects

BackBack to all projects
 

Bunkers, Flaps, Doors and Valves for Ship Tread Unloaders 2 x 50 tones

Client: "Best Technica TM-Radomir" PAD

Completed: 2007 March

Manufacturing, blasting, painting with paints "International" and erection equipment totally 180 tones, for 2 /two/ Ship Tread downloader with upsurge х 50 tones: steel bunkers - 2 pcs х 42 tones, flaps 2 pcs. х 18 tones, flaps 2 pcs. х 8 tones, valves - 2 pcs. х 11 tones, walls and doors 2 pcs. х 12 tones.